Availability: | |
---|---|
NOx ≤ 500 mg/Nm3 2}
Application Area | Unit | Natural Gas Application 50Hz | Associated Petroleum Gas Application 50Hz | Low-Concentration CBM Application 50Hz | Biogas Application 50Hz | Industrial Gas Application 50Hz | Biomass Gas Application 50Hz | Blast Furnace Gas Application 50Hz | Coal-to-Gas Application 50Hz |
Genset Model | – | LY1200GL/M/H-T | LY1200GL/M/H-T1 | LY1200GL/M/H-WL | LY1200GL/M/H-Z | LY1200GL/M/H-M | LY1200GL/M/H-S | LY1200GL/M/H-G | LY1200GL/M/H-M1 |
Electrical Power 3} (±10%) | kW | 1080 | 900 | 1000 | 1050 | 900 | 800 | 800 | 900 |
Fuel Consumption | kW | 2634 | 2368 | 2500 | 2593 | 2368 | 2133 | 2162 | 2368 |
Electrical Efficiency 4} | % | 41.0 | 38.0 | 40.0 | 40.5 | 38.0 | 37.5 | 37.0 | 38.0 |
Thermal Efficiency | % | 46.5 | 48.4 | 47.3 | 46.9 | 48.4 | 48.2 | 48.6 | 47.6 |
Total Efficiency | % | 87.5 | 86.4 | 87.3 | 87.4 | 86.4 | 85.7 | 85.6 | 85.6 |
Note: Factors such as gas quality, air pressure, calorific value, operating environment, and personnel operation level will affect the final output of the unit.
? Sewage Treatment Biogas (65%CH? / 35%CO?)
? Biomass gas (60%CH? / 32%CO?, the rest are N?)
? Landfill gas (50%CH? / 27%CO?, the rest are N?)
? Industrial gas (75%CO, 6%H?, 3%CH?, 9%CO?, the rest are N?)
1}For the transportation size of genset, the components set separately must be considered separately
2}NOx emission: NOx ≤ 500 mg/Nm3, NOx/Nm3 (Content of dry exhaust gas in 5% O?)
3}Refers to ISO8525-1, 50Hz Generator U=10kV, Cosphi=1.0, the minimum methane number of natural gas is MN70
4}Refers to ISO3046-1, 50Hz Generator U=10kV, Cosphi=1.0, the minimum methane number of natural gas is MN70
NOx ≤ 500 mg/Nm3 2}
Application Area | Unit | Natural Gas Application 50Hz | Associated Petroleum Gas Application 50Hz | Low-Concentration CBM Application 50Hz | Biogas Application 50Hz | Industrial Gas Application 50Hz | Biomass Gas Application 50Hz | Blast Furnace Gas Application 50Hz | Coal-to-Gas Application 50Hz |
Genset Model | – | LY1200GL/M/H-T | LY1200GL/M/H-T1 | LY1200GL/M/H-WL | LY1200GL/M/H-Z | LY1200GL/M/H-M | LY1200GL/M/H-S | LY1200GL/M/H-G | LY1200GL/M/H-M1 |
Electrical Power 3} (±10%) | kW | 1080 | 900 | 1000 | 1050 | 900 | 800 | 800 | 900 |
Fuel Consumption | kW | 2634 | 2368 | 2500 | 2593 | 2368 | 2133 | 2162 | 2368 |
Electrical Efficiency 4} | % | 41.0 | 38.0 | 40.0 | 40.5 | 38.0 | 37.5 | 37.0 | 38.0 |
Thermal Efficiency | % | 46.5 | 48.4 | 47.3 | 46.9 | 48.4 | 48.2 | 48.6 | 47.6 |
Total Efficiency | % | 87.5 | 86.4 | 87.3 | 87.4 | 86.4 | 85.7 | 85.6 | 85.6 |
Note: Factors such as gas quality, air pressure, calorific value, operating environment, and personnel operation level will affect the final output of the unit.
? Sewage Treatment Biogas (65%CH? / 35%CO?)
? Biomass gas (60%CH? / 32%CO?, the rest are N?)
? Landfill gas (50%CH? / 27%CO?, the rest are N?)
? Industrial gas (75%CO, 6%H?, 3%CH?, 9%CO?, the rest are N?)
1}For the transportation size of genset, the components set separately must be considered separately
2}NOx emission: NOx ≤ 500 mg/Nm3, NOx/Nm3 (Content of dry exhaust gas in 5% O?)
3}Refers to ISO8525-1, 50Hz Generator U=10kV, Cosphi=1.0, the minimum methane number of natural gas is MN70
4}Refers to ISO3046-1, 50Hz Generator U=10kV, Cosphi=1.0, the minimum methane number of natural gas is MN70
Location: | Inner Mongolia |
Installed Engines: | 22 x LY1600 |
Power Output: | 26.4 MW |
Energy Source: | Industrial gas |
Commissioned: | 2022 |